Planning a Residential Refurbishment: A Complete Guide

Residential

Planning a Residential Refurbishment: A Complete Guide

Thinking of refurbishing your home? From budgeting and procurement to managing the build, here is everything you need to know before you start.

G
Godfrey & Godfrey Consulting
6 min read
Planning a Residential Refurbishment: A Complete Guide

A residential refurbishment is one of the most exciting - and most stressful - projects a homeowner can undertake. Whether you are renovating a period townhouse, converting a commercial building into apartments, or undertaking a whole-house refurbishment in prime central London, the fundamentals are the same: careful planning, realistic budgeting, and the right professional team make the difference between a project you are proud of and one you regret.

This guide covers the key stages of a residential refurbishment and the decisions you will need to make at each one.

Stage 1: Define Your Brief and Budget

The most common mistake in residential refurbishment is starting with the design before establishing a realistic budget. The result is a beautifully designed scheme that cannot be built for the money available - and a painful process of value engineering that compromises the original vision.

Start with a clear brief: what do you want to achieve, and what is your budget? Be honest about both. A quantity surveyor can provide an early order-of-cost estimate that gives you a realistic sense of what your brief will cost to deliver - and, if necessary, where compromises might be made without sacrificing the things that matter most to you.

Contingency

Always include a contingency in your budget. For a refurbishment project - particularly one involving older buildings - a contingency of 10–15% of the construction cost is prudent. Unforeseen conditions are a fact of life in refurbishment work: hidden structural issues, asbestos, services in unexpected locations. A contingency is not pessimism; it is good financial management.

Stage 2: Assemble Your Professional Team

For any significant refurbishment, you will need a professional team. At a minimum, this typically includes:

  • Architect - to develop the design and obtain any necessary planning or listed building consents
  • Structural engineer - for any works affecting the structure of the building
  • Quantity surveyor - to manage costs from feasibility through to final account
  • Principal designer - to manage health and safety in the pre-construction phase (required under CDM 2015 for most projects)

For larger or more complex projects, you may also need a project manager, mechanical and electrical engineer, interior designer, and specialist consultants.

Appoint your professional team early. The value they add is greatest at the beginning of a project, when there is still time to influence the design and procurement strategy.

Stage 3: Design and Planning

Once your team is in place, the design process can begin in earnest. This typically progresses through several stages - concept design, developed design, and technical design - with cost plans updated at each stage to ensure the project remains within budget.

If your project requires planning permission or listed building consent, allow adequate time for this process. Planning timescales vary significantly depending on the local authority and the complexity of the application, and delays at this stage can have a significant knock-on effect on the overall programme.

Stage 4: Procurement

How you procure your contractor will have a significant impact on the cost, programme, and risk profile of your project. The main options are:

Competitive Tender

The most common approach for residential refurbishment is to invite a shortlist of contractors to price the works competitively. This typically produces the best value, provided the tender documentation is sufficiently detailed and the contractors are pricing on a like-for-like basis.

Your quantity surveyor should manage the tender process - preparing the tender documentation, issuing it to contractors, analysing the returns, and recommending the most suitable appointment.

Negotiated Contract

In some circumstances - particularly where time is critical or where a contractor has specialist expertise - it may be preferable to negotiate directly with a single contractor. This can be faster than a competitive tender but requires careful management to ensure value for money.

Design and Build

For some projects, a design and build procurement route - where the contractor takes responsibility for both the design and construction - may be appropriate. This can offer programme and cost certainty, but it transfers design responsibility to the contractor, which may not be appropriate for complex or high-specification projects.

Stage 5: Managing the Build

Once the contractor is on site, the focus shifts to managing the construction phase. Key priorities include:

Programme Monitoring

Construction programmes are rarely delivered exactly as planned. Regular programme reviews - comparing actual progress against the baseline - allow issues to be identified early and mitigation measures put in place before delays become critical.

Variation Management

Changes during construction are expensive. Every variation - whether client-initiated or arising from unforeseen conditions - needs to be properly instructed, valued, and agreed before the work is carried out. Undocumented changes are a primary source of disputes at final account.

Quality

Regular site inspections by the design team and contract administrator ensure that the works are being carried out in accordance with the specification and drawings. Issues identified early are far cheaper to rectify than defects discovered after practical completion.

Communication

Maintain regular, structured communication with your contractor and professional team. A weekly site meeting with minutes is a minimum for most projects. Clear communication prevents misunderstandings and ensures that decisions are made promptly when they are needed.

Stage 6: Practical Completion and Beyond

Practical completion is the milestone at which the works are sufficiently complete for you to take possession of the property. Your contract administrator will inspect the works and issue a certificate of practical completion when satisfied.

After practical completion, the defects liability period begins - typically six or twelve months - during which the contractor is responsible for rectifying any defects that emerge. Keep a careful record of any issues and report them to your contract administrator promptly.

Getting Professional Support

A residential refurbishment is a significant undertaking, and the value of professional support - from a quantity surveyor, project manager, or contract administrator - is difficult to overstate. The cost of professional fees is typically a small fraction of the overall project cost, and the protection they provide against cost overruns, disputes, and defects is substantial.

At Godfrey & Godfrey Consulting, we have extensive experience supporting clients through residential refurbishment projects of all scales and complexities, from single-dwelling renovations to large-scale apartment conversions. If you are planning a project and would like to discuss how we can help, please get in touch.